LOWERING THE COSTS

  • In case of prefabricated wooden framework installation takes two times less time than in case of cut truss.
  • Design ready roof prepared by our company allows lowering the costs of whole project. From the customers we need only to get envelope geometry of truss and load conditions. Our designers prepare necessary technical and manufacturing documentation.
  • Selecting prefabricated roof truss system you may save even 50% of costs.
  • Use of considerably cheaper solutions, that is use of bottom chord in form of roof truss system, allows eliminating costly reinforced concrete roof.
  • Use of Mitek technology for creation of roof trusses allows using considerably lower amount of timber by 20-30% on average.